A swimming pool contractor constructs swimming pools, spas or hot tubs, including installation of solar heating equipment using those trades or skills necessary for such construction.
Authority cited: Sections 7008 and 7059, Reference: Sections 7058 and 7059 (Business and Professions Code)
Content of the Examination
The Swimming Pool (C-53) Examination is divided into six major sections. These sections are:
1. Site Conditions (14%)
Surface and subsurface conditions
Swimming pool and spa location
2. Design (27%)
Plans and specifications
Electrical and plumbing requirements
Selection of finishes
Soil and terrain evaluation
Selection of decorative features and pool accessories
3. Cost Estimation (11%)
Material, labor, and equipment costs
Permit costs
4. Swimming Pool/Spa Installation (38%)
Excavation
Installation and placement of steel and concrete
Electrical and plumbing installation
Installation of finishes
Installation of decorative features and pool accessories
Remodel
5. Maintenance (6%)
Troubleshooting and repair
Water balance
Customer education
6. Job Site Safety (4%)
Personal safety
Traffic control
Shoring and cribbing
*Percentages are approximate*
Sample Questions
The following questions are typical of the types of items that are on the examination. The correct answer is highlighted.
1. On suction side plumbing, what is the maximum flow rate for commercial pools?
6 feet/sec.
8 feet/sec.
10 feet/sec.
12 feet/sec.
2. Which of the following admixtures should be added to accelerate concrete setting?
Sodium chloride
Sodium carbonate
Potassium chloride
Calcium chloride
3. The customer wants to change the coping stone to brick on a 98' perimeter pool. The brick is 3-1/2" wide with a 1/2" grouting joint. Factoring 10% waste, how many bricks will be needed?
288 bricks
323 bricks
357 bricks
432 bricks
*All questions are written and reviewed by licensed contractors who are actively working in the field*